• A backbone project in "Middle and Long-term Planning for National Oil& Gas Pipeline Network", with a total distance of 238 Km
• We supplied with 7 sets of Main Oil Transfer Pump and 5 sets of Oil Feeding Pump. The maximum Head of the Main Oil Trans fer Pump reaches 950m, the Flow 240m³/h, and the power is at 710 KW.